How much is the simple decoration price of three b

2022-07-22
  • Detail

Project 1: Foundation Engineering

shovel the wall skin (gypsum ash) 256.00

wall blank base treatment 540.00

wall/ground cement mortar leveling 840.00

door pocket base (Blockboard) 525.00

remove the brick wall (120 mm) 140.00

remove the brick wall (240 mm) 400.00

remove the original doors and windows and covers 55.00

light brick wall (120 mm double-sided plastering) 1953.00

after removing the wall, the opening Painting 270.00

item 2: Waterway and circuit engineering

strong and weak current construction (lump sum price) 5120.00

waterway construction (lump sum price) 1550.00

strong Installation of weak current box 100.00

change down pipe 296.00

change down pipe 189.00

balcony water outlet 300.00

balcony hot water 300.00

Project III: guest restaurant and aisle

emulsion paint base treatment (putty) 1730.00

emulsion paint 692.00

gypsum board flat ceiling 165.00

gypsum board linear light trough ceiling 1892.00

.General specification of floor tile (500 × 500< Size ≤ 800 × 800) 1334.00

TV background wall 800.00

item 4: master bedroom

emulsion paint base treatment (puttying) 890.00

emulsion paint 356.00

item 5: secondary bedroom

emulsion paint base treatment (puttying) 720.00

emulsion paint 288.00

secondary bedroom 2

emulsion paint base treatment (puttying) 960.00

latex paint 384.00

item 6: kitchen

wall tile general specification (300 × 450 < size ≤ 300 × 600) 1474.00

general specification of floor tiles (size 300 × 300) 335.50

kitchen and sanitary package pipes 195.00

doorway stone paving 25.00

item 7: bathroom

General specification of wall tiles (300 × 450 < size ≤ 300 × 600) 1056.00

common specification of floor tiles (size 300 × 300) 209.00

toilet backfilling and surface leveling 266.00

toilet waterproof treatment 540.00

kitchen and sanitary package pipes 195.00

lintel paving 25.00

toilet sewer protection works 200.00

item 8: balcony

emulsion paint base treatment (batch scraping greasy) 240.00

emulsion paint 96.00

General specification of floor tiles (200 × 200 < size ≤ 800 × 800) 220.00

balcony handrail base tiling 189.00

balcony waterproof treatment 216.00

Item 9: miscellaneous

materials upstairs fee 300.00

materials transportation fee 300.00

indoor garbage removal fee 300.00

lamp installation 200.00

sanitary ware installation 150.00

five gold installation 100.00

finished product protection 300.00

ground fixation 300.00

item 10: other charges

third party supervision 1299.00

in case of decoration If you want to live by yourself, even if it is simple decoration, the infrastructure of Hydropower Engineering cannot be saved, and you can be free in personalized design. The above quotation provides you with a reference. If you happen to want to decorate, you may wish to participate in the decoration bidding of Wuhan home decoration network. The decoration company will go to the door for free to measure your room and make a quotation for you to compare. The details are OK